Manufacturing Processes Sample


In this sample, product A, product B, product C, and product D are packed using packing machines.

- There is a machine called Mixer 1 for the materials mixing process.
- There are 3 packing machines, Packer 1, Packer 2, and Packer 3 for the packing process.
- There is an inspector called Inspector1 for the inspection process.
- Materials of product A, product B, product C, and product D are set as Product A-Material, Product B-Material, Product C-Material, and Product D-Material.
- ProductA-Material, ProductB-Material, ProductC-Material, and ProductD-Material pass the mixing process.
- Intermediate items produced in the mixing process pass the packing process next.
- Then, items produced in the packing process pass the inspection process and finally ProductA, ProductB, ProductC and ProductD will be produced.